Project: MattJ   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Nov 01, 2020     Paint Booth       Category: Paint / Decals
After talking with builders, and considering the expense of transporting the aircraft, the cost of paint shop, in addition to many shops being booked extremely far out, I have decided to paint my aircraft myself.

A builder recommended a inflatable booth after he built a standard type paint booth. The nice thing is the ability to store it away. It comes with 2 blowers for inflation and a 3rd blower for air into the spray area itself. The air is filtered entering the booth and the spray is filtered as it exits out 2 side panels.

I live in a very dusty area to I am going to build a filter box around the booth blower to pre-filter the entry air.

I will be adding interior scaffolding that will have 2 jobs. First, it will holdup the parts to be sprayed and second, it will support the booth in case the inflation blowers stop running.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.